• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/common.inc on line 2892.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/common.inc on line 2892.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/module.inc on line 482.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/module.inc on line 482.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/module.inc on line 482.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/module.inc on line 482.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/module.inc on line 482.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/pinebeltsports.com/site1/includes/module.inc on line 482.

$788K project to resurface 14 county miles

A project to resurface about 14 miles of roads will be moving ahead following the decision of the Lamar County Board of Supervisors to approve the roughly $788,000 project during Monday’s board meeting.

 

 

The content you're trying to view is available for Premium Content Subscribers only. Online subscription options are available for as low as $2.50 per month and are complimentary to all existing print subscribers of The LAMAR TIMES and The PETAL NEWS. 

 

For more information about subscription options or to activate your account as an existing print subscriber, simply click here.